Central Hudson, Sturgeon Pool, and a decade of harmful algal blooms.

Two Central Hudson dams have run on the lower Wallkill since the early 1920s without a federal license; in February 2025 FERC ruled that licensing is required. In the compiled public record, 60 of 66 mainstem bloom reports since 2015 fall inside the two dammed pools. That pattern demands study. It is not, by itself, proof of cause. [1] [22]

Updated October 9, 2026 · Bloom data through October 8, 2026 · Every figure is numbered to a source

Sturgeon Pool, September 27, 2025. Drone photograph by Robert Howe. Aerial view of green cyanobacteria streaks swirling around a dock along a residential shoreline.
Sturgeon Pool · September 27, 2025 · Drone photograph: Robert Howe. Appearance alone cannot identify toxins.

The film

Watch Still Waters

69th Annual New York Emmy Awards · Nominee

Still Waters: Exposing Cyanobacteria in the Wallkill River (2026)

Nominated in Environment: Science, Short Form Content. A Marist College student production in partnership with the Wallkill River Watershed Alliance and the Hudson River Watershed Alliance. The awards are presented October 10, 2026; this page does not report an outcome. [10] [34]

Watch on YouTube · Visit the film page

A century-old pair of dams, a river that slows to a stop each summer, and blooms that keep returning. Still Waters follows the community scientists documenting the Wallkill's cyanobacteria problem. The record below puts the film in context, with its limits stated. [10]

Use the player's caption controls if captions are available. No verified transcript was supplied; the written evidence on this page stands on its own.

Director
Emma Stuber
Editors & Cinematographers
Carter McDavitt, Emma Gaecklein, Emma Stuber
Drone Cinematography
Jeffrey Basinger
Featured Interviews
Martha Cheo and Bobby Howe, Wallkill River Watershed Alliance
Special Thanks
Hudson River Watershed Alliance

See the river.
Hear the community.
Then read the record.

What is documented

Blooms keep returning to the dammed pools.

Sixty of 66 public mainstem bloom reports since 2015 fall in Sturgeon Pool and the Dashville–New Paltz pool. Where people look and report also shapes that pattern. [22]

What is unresolved

How much do the dams contribute?

FERC's own staff flagged that peaking at Sturgeon Pool may lengthen residence time and worsen algae. Nutrients, heat, and flow all matter. No study has yet measured the dams' share. [2]

What we are asking

Make the licenses answer the question.

Flow rules that break up stagnation, a real cyanobacteria study, a pool survey, prompt public reporting, and safe public access. See the asks and comment to FERC.

Key numbers

The record, at a glance.

Three kinds of record, kept apart: what has been counted, what agencies have filed, and what the study schedule says. Each figure is dated and sourced.

What has been counted

How long without a license

~100 yrs

The two projects have operated since the early 1920s. On February 6, 2025, FERC found that federal licensing is required.

Agency record · [1] [3]

Reports inside the two pools

60 / 66

Mainstem bloom reports, 2015–2026 (90.9%). These are reports, not separate bloom events. DEC data as of October 8, 2026.

Compiled observations · [22]

Sturgeon Pool on the state list

Impaired

New York's 2022 assessment lists Sturgeon Pond (Sturgeon Pool) as impaired for phosphorus and dissolved oxygen. Fishing and recreation are "Not Supporting."

State assessment · [25]

What agencies filed

Continuous minimum flow today

None

"The Projects currently do not release any continuous minimum flows." U.S. Fish and Wildlife Service, September 29, 2025.

Agency filing · [29]

Blooms Riverkeeper reported

24+

"At least 24" cyanobacteria blooms in the project area since 2015, most in Sturgeon Pool, as FERC summarized Riverkeeper's comments.

Summarized statement · [2]

What the schedule says

Water-quality season FERC approved

Jun 1–Oct 31

NYSDEC and USFWS asked for a longer season, April 15–November 15. FERC approved June 1–October 31.

Study decision · [2] [30]

When the study report is due

Apr 12, 2027

Central Hudson's Initial Study Report. A study-report date, not a public-comment deadline. Comments can be filed now.

Schedule · [2] [23]

Where the blooms are

One river. Two dams. Twelve miles of slowed water.

An impoundment is the pool of water a dam holds back. On the lower Wallkill there are two in a row: the Dashville pool, which the project filing says reaches "approximately 10 miles upstream" toward New Paltz, and Sturgeon Pool below it. [22]

The river flows from New Paltz through Rifton and Rosendale, over the Dashville dam, through Sturgeon Pool, over the Sturgeon Pool dam, and into the Rondout Creek. Central Hudson's approved recreation study inventories the public facilities "that provide direct access to the projects' impoundments." With a pool reaching toward New Paltz, that inventory covers a long stretch of river. [2]

Central Hudson Gas & Electric is the applicant for both projects: P-15397 (Dashville) and P-15396 (Sturgeon Pool). FERC's May 2025 notice describes Sturgeon Pool as 212 acres holding 2,894 acre-feet at a water level of 132.5 feet; the pre-application document gives 251 acres. The records do not agree. [19] [27] [39]

Read downstream

  1. New PaltzApproximate upper end of the Dashville pool; Village boat launch
  2. Dashville pool → Dashville damProject P-15397 · run-of-river operation
  3. Sturgeon Pool → Sturgeon Pool damProject P-15396 · peaking operation; outflow can swing from near zero to about 1,800 cfs in a day
  4. Rondout Creek → Hudson RiverDownstream connection

Orientation only; not to scale, not a surveyed pool boundary. Operating modes and flow range as described by FERC staff and USFWS. [2] [29]

Project map

Explore the lower Wallkill

Open full-screen map
ArcGIS Experience map. Use the full-screen link if the frame is cramped. The map is supplied by Esri. It is not a current bloom alert, and a location on the map is not, by itself, proof of cause.

Interactive map

Every mapped report, 2015–2026, on the WRWA reach map

Open full-screen map
View the 66 reports as a table. Click a numbered reach for its report history; toggle the 2015–2025 and 2026 report layers, DEC sites and landmarks. The map shows all 89 supplied watershed reports and groups the mainstem into 12 reaches and 5 sectors; its reach counts are WRWA's reach analysis and differ from the three-zone tally in the next section, which is the headline figure. Basemap tiles are served by Esri. Report dots inside the map are not keyboard controls; the table link and the reach list in the full-screen map are. [38]

Photographs document appearance at a place and time; the DEC matches are by date and location, not laboratory results from these images. They do not establish toxin levels or the cause of a bloom. [24]

Sturgeon Pool on September 27, 2025

Mapbox: Sturgeon Pool, September 27, 2025

Dated visual record of the pool on the day of the hero photograph. It is not a current bloom alert or evidence of cause. The map is supplied by an external service.

Open the full interactive map · Map source [20]

What the record shows

Nine of every ten reports sit behind the dams.

Compiled public record

60 / 66

mainstem bloom reports fall within the two dammed pools.

New York mainstem Wallkill + Sturgeon Pool · May 2015–October 6, 2026 · DEC Monitoring Portal and NYHABS data as of October 8, 2026. [22]

Reports in the three-zone tally
ZoneReports
Sturgeon Pool (dam to Dashville dam)37
Dashville–New Paltz pool (about 10 miles)23
Rest of the New York mainstem6
Total66

Reports classified by DEC as suspicious, confirmed, or confirmed with high toxins. They are not a count of separate bloom events or of toxic blooms. Counting confirmed reports only: 50 of 56 (89%) fall in the two pools. Counting distinct report dates: 49 zone-days, 30 of them in Sturgeon Pool. [22]

Where the river slows, the reports cluster

60 of 66 reports sit in the two dammed pools.

Public mainstem Wallkill and Sturgeon Pool, May 2015–October 6, 2026. DEC data as of October 8, 2026.

90.9%60 of 66 in the two pools, at the approximate 10-mile limit

37Sturgeon Pool, from its dam up to the Dashville dam

23Dashville–New Paltz pool, about 10 miles above the dam

6Rest of the New York mainstem

Schematic profile. Not a survey, and not to scale. Upstream is to the right.

  1. Sturgeon Pool37 reports
  2. Dashville pool to New Paltz23 reports
  3. Upstream river6 reports

The flat steps are the two pools. The rise is the river above them. Dots mark the zones, not individual report locations. 90.9% uses the filing's approximate 10-mile pool. One mile shorter is 80.3%. Two miles shorter is 69.7%.

Current version of the pool graphic, drawn from the October 9, 2026 tally. It replaces the earlier graphic's 47-of-55 headline. [22]
How the count was made, and why it differs from the earlier page

The compilation combines DEC Monitoring Portal records for 2015–2025 and NYHABS records for 2026. It excludes tributaries, separate lakes and ponds, "no bloom" samples, and the New Jersey Wallkill. Every local WRWA record matched a public record; nothing was added by hand.

The earlier page's 59 of 65 used a September 19, 2026 cutoff. The October 6, 2026 confirmed report at Sturgeon Pool brings the totals to 60 of 66. Merging same-day reports at nearly the same place yields a different measure, 59 of 65 bloom-location-days. The matching numbers are a coincidence, not the same dataset. The earlier "89 reports" figure counted the whole watershed, including lakes and tributaries; it is not a mainstem count.

By year, the raw mainstem totals are 2015: 1 · 2016: 15 · 2017: 0 · 2018: 0 · 2019: 3 · 2020: 3 · 2021: 0 · 2022: 15 · 2023: 3 · 2024: 3 · 2025: 9 · 2026: 14. The zeros mean DEC holds no bloom record for those years, not that the river was clear.

WRWA table of NYS DEC-archived mainstem and Sturgeon Pool HAB report records by analytical reach and year, 2015 to 2025: 52 records on 38 unique dates, with Sturgeon Pool at 22 and the Golf course to Wallkill View Farm reach at 10.
The 2015–2025 DEC record by WRWA reach (52 records, 38 unique dates). The tally reproduces this table's annual totals exactly (1/15/0/0/3/3/0/15/3/3/9); the 2026 season adds 14. Reach counts here are finer than the three zones used for the headline share. [38] [22]

2026: fourteen reports, a lab-confirmed toxin producer, and an agency's own sighting.

As of October 8, 2026, DEC holds 14 mainstem reports on 11 dates for the 2026 season, including a confirmed report at Sturgeon Pool on October 6. [22] On June 30, 2026, a targeted surface sample was collected at Sturgeon Pool after a volunteer HAB Watcher observation. It was lab-confirmed on July 2 at Riverkeeper's Kingston laboratory: microscopic analysis identified high concentrations of Microcystis, a toxin-producing cyanobacterium. WRWA reported the result publicly on July 3. [9] This confirms the identity and abundance of a toxin-producing organism in that sample. It is not a measurement of toxin concentration.

Lab documentation pending upload.

The year before, the U.S. Fish and Wildlife Service recorded that during the August 28, 2025 environmental site visit it "noted a harmful algal bloom in the impoundment near the intake structure" at Sturgeon Pool, and asked that blooms be treated as a potential project impact. Riverkeeper documented a bloom running from August 10 to September 25, 2025. [29] [2]

Central Hudson's July 1, 2026 progress report does not mention blooms. The lab result may have arrived after that filing; the sequence does not establish concealment. Its October 1 report says 2026 water-quality data will be provided in the April 2027 Initial Study Report. [3] [31]

Sturgeon Pool, sample date June 30, 2026. WRWA graphic: HAB update reporting lab-verified Microcystis; harmful to humans, fatal to pets.
WRWA's July 3, 2026 post. Community scientists, not the licensee, documented and confirmed this bloom. [9]

The state already lists these waters as impaired.

New York's 2022 assessment, stored in EPA's ATTAINS database, lists Sturgeon Pond (Sturgeon Pool) as impaired for phosphorus and dissolved oxygen, and the Lower and Middle Wallkill for phosphorus and pH. All three are rated "Not Supporting" for fishing and for primary and secondary contact recreation. These are water-quality findings; they do not assign responsibility to a dam. [25]

Compare the three assessed waterbodies
Listed impairment parameters · 2022 assessment cycle
Waterbody / assessment unitListed concerns
Sturgeon Pond · NY1306-0037Phosphorus; dissolved oxygen
Lower Wallkill · NY1306-0027Phosphorus; pH
Middle Wallkill · NY1306-0038Phosphorus; pH

Other parameters meet criteria or lack enough information; this table selects the listed impairment parameters. The assessment is dated and is not a current bloom advisory. Inspect the saved agency records (text)

More photographs: Sturgeon Pool in 2023, 2025, and from the air
Sturgeon Pool, 2023. Image from a public NYSDEC NYHABS report. Opaque pea-green water along a wooded, rocky shoreline during an algal bloom.
Sturgeon Pool, 2023. Image from a public NYSDEC NYHABS report. [11]
Sturgeon Pool, 2025. Image from a NYSDEC NYHABS report. Bright green algal bloom washed up along a sandy shoreline beside stone steps.
Sturgeon Pool, 2025. Image from a NYSDEC NYHABS report. [11]
Lower Sturgeon Pool, September 6, 2025. Drone photograph by Robert Howe. Bright green bloom hugging a rock-ledge shoreline under overhanging trees.
Lower Sturgeon Pool · September 6, 2025, same flight as the gallery image. Photo: Robert Howe. [33]
Upper Sturgeon Pool, September 29, 2025. Drone photograph by Robert Howe. Green surface streaks extending around a wooded peninsula.
Upper Sturgeon Pool · September 29, 2025. Drone photograph: Robert Howe. [33]

Photographs show visible conditions, not toxin levels or cause. Dates follow the project photo register. [24]

What remains unresolved

The pattern is clear. The cause has not been measured.

Harmful algal blooms (HABs) are overgrowths of cyanobacteria, often called blue-green algae. Some produce toxins. Nutrients, heat, sunlight, and slow water all feed them. The licensing studies are the first chance to measure how much the dams add. [24]

Does holding water back help blooms develop?

FERC staff wrote that "peaking operations at the Sturgeon Pool Project may increase the residence time of project waters in a manner that would exacerbate algal (chlorophyll-a) or nutrient levels," and that project operation may also influence water temperature. That is the agency's reason to sample nutrients; it is a study question, not a measured share. [2]

How do upstream nutrients and weather fit in?

Central Hudson points to FERC's Walden Hydro order, which attributed blooms upstream primarily to excess nutrient loading. Upstream nutrients are real; they do not resolve what slow, warm pool water does with them. The river drains about 783 square miles, roughly 22% agriculture and 15% developed land. [2] [28]

How big are the pools, really?

The filings put Sturgeon Pool at 2,894 acre-feet. DEC's lake map lists 194 acres at a mean depth of 34.4 feet, about 6,674 acre-feet. Central Hudson's own pre-application document gives 251 acres and a 34-foot mean depth, which multiplies to roughly 8,500. Residence time cannot be estimated until the volume is settled, and the applicant has offered flood-study profiles instead of a survey. [26] [27] [37] [39]

Pool depth: the records disagree by a factor of two
NYSDEC Sturgeon Pool map with 20, 40, 60 and 80 foot depth contours, a listed area of 194 acres and mean depth of 34.4 feet.
NYSDEC Lake Map Series, Sturgeon Pool. Depth labels are feet. Marked "Not For Use in Navigation." [26]

Two official figures, one pool.

  • DEC lake map: 194 acres, mean depth 34.4 feet; 194 × 34.4 ≈ 6,674 acre-feet. A simple calculation from the map labels, not a DEC-printed volume. [26]
  • FERC's May 2025 notice: 212 acres and 2,894 acre-feet at a water level of 132.5 feet mean sea level. [27]
  • Central Hudson's own pre-application document: 251 acres, the same 2,894 acre-feet, and a mean depth of 34 feet with a maximum of 93 feet. Its own area times its own mean depth is about 8,500 acre-feet, three times the storage it states. [39]

The sources may differ in age, coverage, water level, or how storage is defined. The gap does not show which is right or that anyone misstated anything. It does show that the licensing record needs a current depth-and-volume survey tied to a stated water level and datum. NYSDEC has already asked how deep the Sturgeon Pool monitors will sit, noting the pool "has varied depths." [30]

A flood study is not a depth survey.

NYSDEC asked for a bathymetric survey "accurately mapping water depths and underwater profiles," and Riverkeeper supported it. In its March 2026 Revised Study Plan, Central Hudson instead said it "will provide the results of the Federal Emergency Management Agency (FEMA) Flood Insurance Study conducted in Ulster County (Flood insurance study number 36111CV004B) that documented water depths and underwater profiles for the majority of the Dashville reservoir." [37]

Those FEMA profiles are hydraulic-model cross-sections drawn for flood mapping. In the project's first look at the digital sections, they are spaced 0.1 to 1.3 miles apart, none lies within half a mile of the Dashville dam, and the datum of the filed 172.5-foot pool level is unstated. They give channel depths of roughly 3 to 19 feet at the sections, against the pre-application document's own stated maximum of 38 feet for the Dashville pool. They cannot stand in for a survey. [36] [39]

Volume divided by upstream gauge flow would be an idealized scenario, not a measurement of how long water actually sits in an operating pool. The FEMA depth figures are a provisional screening read, not a published result.

Watershed context: what else reaches the pools?

The river drains a much larger landscape.

The project's GIS analysis maps about 783 square miles draining toward Sturgeon Pool. Its 2021 land-cover summary is roughly 22% agriculture, 15% developed land, 45% forest, and 15% wetland. [28]

The map also locates wastewater facilities and stormwater outfalls. These are places to investigate inputs. Their presence does not measure a nutrient load, establish a violation, or show how much any source contributes to blooms.

The study question: how do nutrients arriving from the watershed interact with water movement and conditions inside each pool?

Project map of the elongated basin draining toward Sturgeon Pool, with the Wallkill River, wastewater facilities shown in orange, and stormwater outfalls shown in gray.
Project GIS figure using USGS basin and river data and public facility inventories. Orange: wastewater facilities. Gray: stormwater outfalls. Points show locations, not measured pollution. [28]

Percentages summarize NLCD 2021 pixels within the project's contributing basin. Newer crop-cover data in the project uses different categories and is not a directly comparable trend.

Flow and weather: what the upstream gauge can and cannot tell us

The Gardiner gauge (USGS 01371500) sits upstream of both dams. It measures what flows into the pools, not what Central Hudson releases. The earlier page's 2026 chart below plotted provisional 15-minute flow averages against report days, and two of its twelve marked days (July 26 and August 27) were non-mainstem reports. It is retained for traceability; it is not a current mainstem analysis, and its 300 cfs line is an illustrative reference, not a proven bloom threshold. [12]

Wallkill River daily mean flow at Gardiner, June to September 2026, with HAB report days Archived graphic: provisional 15-minute flow averages from the upstream Gardiner gauge, with 12 bloom-report days including two non-mainstem reports. Blue line is flow; red circles are report days; dashed gold line is an illustrative 300 cfs reference. Not a current mainstem-only analysis. Archived provisional data, includes two non-mainstem report dates. 100 300 1000 3000 300 cfs reference (illustrative) Jun Jul Aug Sep Jun 05: 1 HAB report(s), 210 cfs Jun 08: 1 HAB report(s), 173 cfs Jun 15: 2 HAB report(s), 182 cfs Jun 25: 2 HAB report(s), 235 cfs Jun 29: 2 HAB report(s), 314 cfs Jun 30: 2 HAB report(s), 218 cfs Jul 13: 1 HAB report(s), 438 cfs Jul 26: 1 HAB report(s), 318 cfs (non-mainstem) Aug 20: 1 HAB report(s), 316 cfs Aug 21: 1 HAB report(s), 919 cfs Aug 27: 1 HAB report(s), 309 cfs (non-mainstem) Sep 19: 1 HAB report(s), 230 cfs cfs (log scale)

Blue line: upstream daily flow. Red circles: report days. A rebuilt comparison of all 66 report dates against official USGS daily values is a planned follow-up; it was not completed for this revision and no flow threshold is claimed here. [12] [22]

The filings and who owns the dams

A century without a license. Now the record is open.

The Federal Energy Regulatory Commission (FERC) licenses hydroelectric projects on navigable rivers. For a hundred years these two were never licensed.

USFWS asked FERC in 2019 to decide whether the projects needed licenses. Central Hudson argued that a 1919 New York Conservation Commission permit for the Dashville dam was still valid and barred FERC jurisdiction. New York's own environmental agency disagreed: NYSDEC told FERC in January 2021 that the 1919 approval, like the July 1922 approval for Sturgeon Pool, was "for construction only," and that "neither the Dashville nor the Sturgeon Pool dam facilities has a permit to operate the dam, as Central Hudson claims." [35]

On February 6, 2025, FERC found that the projects sit on a navigable waterway, hold no valid pre-1920 federal permit, and must be licensed. Central Hudson filed its notice of intent on May 30, 2025. [1] [19] [29]

Who owns them: Central Hudson Gas & Electric "is a subsidiary of CH Energy Group and an indirect wholly-owned subsidiary of Fortis," in its parent's own words. Ownership identifies who answers in the licensing; it does not by itself establish responsibility for any bloom. [8]

Before FERC can issue a license, New York must grant or waive a Clean Water Act §401 water-quality certification, and NYSDEC can attach conditions. That is the state's lever. [16]

  1. New York's Conservation Commission approves construction of the Dashville dam (United Hudson Electric Corporation) and, on July 19, 1922, the Sturgeon Pool dam. [35]

  2. USFWS asks FERC for an updated jurisdictional determination. [29]

  3. NYSDEC rebuts Central Hudson's pre-1920 permit argument: construction approvals only; no permit to operate. [35]

  4. FERC finds federal licensing required (190 FERC ¶ 62,077). [1]

  5. Central Hudson files its notice of intent and pre-application document. [19]

  6. USFWS files study requests; reports a bloom seen near the Sturgeon Pool intake. [29]

  7. NYSDEC asks again for an April 15–November 15 monitoring season and for monitor depths. [30]

  8. FERC issues its study-plan determination. [2]

  9. First study progress report; no mention of blooms. [3]

  10. Second progress report: monitoring and field studies under way. [31]

  11. Initial Study Report due. A study deadline, not a comment deadline. [2]

What the study decision did, and did not, require

01

The permit defense did not hold

Central Hudson's October 2020 comments claimed a valid pre-1920 state permit. NYSDEC's reply: the 1919 and 1922 approvals were construction approvals, distinct from any approval to operate, so state law "does not appear to prohibit FERC licensing." FERC ordered licensing four years later. [35] [1]

02

Residence time is on FERC's list

FERC staff wrote that Sturgeon Pool's peaking operations "may increase the residence time of project waters in a manner that would exacerbate algal (chlorophyll-a) or nutrient levels." [2]

03

Nutrient sampling, over the applicant's position

Central Hudson said it was "not adopting" requests to monitor nitrogen, phosphorus and chlorophyll-a, citing the lack of state standards and of evidence. FERC required biweekly grab samples for all three anyway. [2]

04

A shorter season than the agencies asked for

NYSDEC and USFWS requested April 15–November 15. FERC approved June 1–October 31, saying earlier spring sampling was not justified. [2] [30]

05

No cyanobacteria-specific study

Riverkeeper's proposed cumulative-effects cyanobacteria study (Study 15), with daily phycocyanin and weekly nutrient sampling, was not required. FERC instead ordered Central Hudson to document any observed bloom across the whole June–October season, not just on biweekly visits. No phycocyanin or toxin testing was required. [2]

06

No continuous minimum flow today

USFWS: "The Projects currently do not release any continuous minimum flows," and flows below Sturgeon Pool "can vary daily from low-leakage to no flow conditions to 1,833 cubic feet per second." USFWS asked for a base-flow study and bypass-reach flow evaluation. [29]

07

Upstream nutrients in the record

Central Hudson cited the Walden Hydro order (185 FERC ¶ 62,097) to argue that nutrient loading, not hydropower, drives blooms. Upstream sources are real; the filing position does not resolve the contribution of project operations. [2]

Corporate structure beyond the Q2 statement: what is confirmed and what is not

Confirmed from a primary document: Central Hudson "is a subsidiary of CH Energy Group and an indirect wholly-owned subsidiary of Fortis" (CH Energy Group, unaudited Q2 2026 financial statements, Note 1). [8] The New York PSC approved Fortis's acquisition of CH Energy Group in Case 12-M-0192 (order of June 26, 2013). [18]

The earlier page also showed the chain below and stated a $65-per-share price, a "Federation Model" of local management, and a 6.1% stake in NY Transco. Those details were not confirmed against primary filings for this revision and are shown for traceability only.

Fortis Inc.St. John's, Newfoundland, Canada
FortisUS Holdings Nova Scotia Ltdunconfirmed
FortisUS Inc.unconfirmed
CH Energy Group, Inc.
Central Hudson Gas & Electric Corp.FERC applicant: Sturgeon Pool P-15396 · Dashville P-15397

The twelve-year gap between the 2013 acquisition and the 2025 licensing filing is a matter of dates in the public record. The record does not establish what Fortis knew at acquisition or why the filing came when it did.

Separate corporate and regulatory background (not bloom evidence)

This material is not evidence of bloom causation. It is retained because the earlier page discussed it and readers may look for it.

Billing-system proceedings. The PSC investigated Central Hudson's billing-system rollout (Matter 22-00666; Cases 22-M-0645 and 22-E-0121). On January 30, 2023, Central Hudson requested confidential treatment for material attached to a response. A request is not a Commission ruling and does not establish concealment. [6]

Former gas-plant cleanup. Central Hudson's 2021 Site Investigation and Remediation report recorded $116,485,802 in costs through December 31, 2021 across nine sites, overseen in PSC Case 11-M-0034. These are historical figures about former manufactured-gas-plant sites, not about the dams. [5] [14] [15]

Financial filings. Regulatory returns for the rate year ended June 30, 2026 and the unaudited CH Energy Group Q2 2026 statements document corporate reporting, not project-specific funds. [7] [8]

Court cases. This review found no active environment-specific civil case concerning the two projects. FERC licensing and PSC/NYSDEC oversight are administrative proceedings, not lawsuits. The search was bounded, not exhaustive.

Take action

What we are asking FERC and New York to require.

These are the asks of Still Waters and the Wallkill River Watershed Alliance. Each one is tied to something already in the record. None presumes the answer; each demands that the licenses be built to find it.

  1. Break up stagnation with flow. Evaluate and require minimum flows and summer operating rules that prevent prolonged stagnation in Sturgeon Pool and the Dashville pool. Today no continuous minimum flow is released, and FERC staff named longer residence time as a plausible driver. [2] [29]
  2. Study the blooms themselves. Measure cyanobacteria (phycocyanin), toxins, nutrients, temperature and residence time together, April through November, as the agencies asked, not only on biweekly logger visits. [2] [30]
  3. Measure the pools. Require a modern depth-and-volume survey of both impoundments tied to a stated water level and datum. The public figures for Sturgeon Pool differ by more than two to one, and Central Hudson has offered FEMA flood-study profiles in place of the bathymetry NYSDEC asked for. [26] [27] [37]
  4. Tell the public in real time. Report observed blooms to NYSDEC and the public as they happen, not in an April 2027 study report. [31]
  5. Protect the river's life. Rigorous mussel, fish and American eel surveys, and entrainment and passage studies, as USFWS requested. [29]
  6. Open the river safely. Formal, safe public access across the project footprint, including Central Hudson's shoreline on Sturgeon Pool, portage routes, and bloom warning signs. DEC's own page describes no formal access today. [13] [32]

Comment to FERC

P-15396 Sturgeon Pool
P-15397 Dashville

  1. Write your comment first (up to 10,000 characters). Say what you have seen on the river and which of the asks above matter to you.
  2. Open FERC eComment, enter your name, address and email, and click Authorize. FERC emails you a link to the comment form.
  3. Search for and add both dockets, paste your text, and submit. Your comment becomes part of the public record in eLibrary.

eComment is for individuals filing on their own behalf. Organizations, attachments, and motions to intervene use eFiling. Filing a comment does not make you an intervenor. Check the docket for current notices. [23]

A short starting point for your comment

Regarding Sturgeon Pool (P-15396) and Dashville (P-15397): I am concerned about the recurring harmful algal blooms in the project impoundments. Please require the licenses to evaluate minimum flows and summer operations that prevent stagnation; a cyanobacteria study that measures phycocyanin, toxins, nutrients, temperature and residence time from April through November; a current depth-and-volume survey of both pools; prompt public reporting of observed blooms; adequate mussel, fish and eel studies; and formal, safe public access with warning signs. I ask that the studies be designed to determine how much project operations contribute to these blooms.

Add your own experience. Comments in your own words carry more weight than copied text.

Sources and sharing

Follow the sources. Keep the context.

Agency records, the project's data compilation, and community observations are kept distinct below. Source numbers from the earlier page are retained so older citations still resolve; new entries continue the sequence.

Earlier materials retained for traceability: the 1920 profile and the superseded reach table

The 1920 Rifton Valley profile

Rifton Valley, 1920. Photographed historical map and river profile credited to Central Hudson Electric Corp., depicting proposed dams and water levels.
Historical context, not a present-day depth survey. The photographed sheet credits Central Hudson Electric Corp.; publication and rights were not verified, and the project media log lists permission as pending. [21]

Earlier reach table: superseded counts

Retained for comparison only. This is the earlier page's reach-based 59/65 table (data through September 19, 2026). Its reach definitions differ from the three-zone tally and its "25 of 65 in Reach 1" figure is no longer used. See the current tally.

Mainstem HAB reports by reach, 2015–2026 (superseded), compiled from the NYSDEC archive and reclassified by WRWA. Gardiner's zero reflects an archive gap, not evidence that blooms were absent. [11]
ReachSectorRiver milesReports
1 · Sturgeon PoolImpoundment0.5–1.425
2 · Rifton (Route 213)Impoundment1.4–2.911
3 · Perrine's BridgeImpoundment2.9–6.52
4 · Springtown curvy reachImpoundmentSee map0
5 · Springtown bendImpoundmentSee map1
6 · Rail trail to golf courseImpoundmentSee map5
7 · Golf course to Wallkill View FarmImpoundmentSee map15
8–9 · GardinerUpstream12.0–24.00*
10–12 · Walden & MontgomeryUpstream24.0–38.06
Impoundment total (Reaches 1–7)59 / 65

Source register

Counts and methods are a dated project compilation, not an independent causal study. External links and hosted documents remain under their publishers' control.

  1. FERC, Order Finding Licensing of Hydroelectric Projects Required, 190 FERC ¶ 62,077, February 6, 2025. Dockets UL19-1-000 and UL19-2-000; accession 20250206-3051. Open order record; search eLibrary if the record link does not load.
  2. FERC, Study Plan Determination, P-15396-001 and P-15397-001, April 22, 2026, accession 20260422-3021. Sets the April 12, 2027 Initial Study Report deadline (p. 3); residence-time, nutrient-sampling, season and Study 15 discussion in Appendix B (pp. B-3 to B-5, B-27 to B-29). FERC record.
  3. Central Hudson Gas & Electric, First Study Progress Report, filed July 1, 2026, accession 20260701-5121. Open the report.
  4. Central Hudson Gas & Electric, 2021 Site Investigation and Remediation (SIR) Annual Report. Open report.
  5. Central Hudson, Request for Confidential Treatment, January 30, 2023, Matter 22-00666; Cases 22-E-0121, 22-M-0645, and 98-M-1343. Open request.
  6. Central Hudson, regulatory returns for rate year ended June 30, 2026, filed September 30, 2026. Open filing.
  7. CH Energy Group, Inc., unaudited condensed financial statements, quarter ended June 30, 2026, Note 1 (Corporate Structure). Open the report.
  8. Wallkill River Watershed Alliance, Instagram post and first carousel image, July 3, 2026; public report of a June 30, 2026 targeted surface sample at Sturgeon Pool, collected after a volunteer HAB Watcher observation and lab-confirmed July 2 at Riverkeeper's Kingston laboratory as high concentrations of Microcystis by microscopic analysis. The confirmation is of organism identity and abundance, not a toxin concentration.
  9. Still Waters: Exposing Cyanobacteria in the Wallkill River, Marist College student production with WRWA and Hudson River Watershed Alliance, 2026. Credits and nomination category as stated on the film page.
  10. NYSDEC HAB archive and the earlier WRWA reach-map compilation, 2015–2026. The static reach-map screenshot has been replaced by the interactive map in source [38]. The superseded reach table is retained below for context; current counts and limitations are in source [22]. NYHABS map and reporting; NYSDEC 2026 program notice.
  11. USGS gage 01371500, Wallkill River at Gardiner, NY, and Open-Meteo historical weather. The archived June–September 2026 graphic used provisional 15-minute flow means and included two non-mainstem report dates; it is not a current mainstem analysis. USGS gage; Open-Meteo archive API.
  12. 18 C.F.R. § 2.7, Recreational development at licensed projects. eCFR.
  13. New York State Department of Public Service, Case 11-M-0034 (Matter 11-00194), Site Investigation and Remediation costs. DPS case docket.
  14. NYSDEC, Poughkeepsie Water Street Manufactured Gas Plant site record (C314070). DEC site documents.
  15. Clean Water Act § 401, 33 U.S.C. § 1341. U.S. Code.
  16. New York PSC, Case 12-M-0192, Order Authorizing Acquisition Subject to Conditions, June 26, 2013. Search the DPS document repository by case number. Acquisition price and governance details from the earlier page were not confirmed against this order.
  17. FERC, Central Hudson Gas and Electric Corporation, Notice of Intent to File License Application and Filing of Pre-Application Document, Federal Register, July 31, 2025 (90 FR 36037); records the May 30, 2025 filing. Read the notice.
  18. Mapbox, Sturgeon Pool view focused on September 27, 2025. Open the full interactive map.
  19. Photograph supplied by the user showing a printed "Profile of Rifton Valley, 1920"; the sheet credits Central Hudson Electric Corp. Publication, provenance and rights not independently verified. Open the image.
  20. Project compilation, October 9, 2026: Wallkill mainstem + Sturgeon Pool public bloom reports, May 2015–October 6, 2026; DEC Monitoring Portal and NYHABS data as of October 8, 2026. 66-row CSV. The zone totals, boundary checks, and count rules are in the tally section above. Row totals were checked for this page; the compilation was not independently rebuilt from live agency feeds.
  21. FERC, How to File an eComment and eComment authorization, consulted October 9, 2026. Check the latest project notice for applicable deadlines.
  22. NYSDEC, Harmful Algal Blooms: identification, causes, and precautions; NYHABS map and reporting.
  23. New York's 2022-cycle waterbody assessments in EPA ATTAINS, units NY1306-0037 (Sturgeon Pond), NY1306-0027 (Lower Wallkill), NY1306-0038 (Middle Wallkill); saved October 9, 2026. Saved records (text file); EPA ATTAINS. A dated assessment, not a current safety advisory.
  24. NYSDEC, Lake Map Series, Sturgeon Pool contour map (Region 3). Official PDF; hosted map image. Map labels: surface area 194 acres; mean depth 34.4 ft; "Not For Use in Navigation." The 6,674 acre-foot figure is 194 × 34.4, rounded; DEC does not print a volume.
  25. FERC, Notice of Preliminary Permit Application, Sturgeon Pool Project No. 15396-000, Federal Register 90 FR 18850, May 2, 2025 (FR Doc. 2025-07660): impoundment "surface area of 212 acres and a storage capacity of 2,894 acre-feet at a water surface elevation of 132.5 feet msl"; three units totaling 15,600 kW. Federal Register PDF. Cited for physical description, not for a current deadline.
  26. Project Chapter 2 GIS analysis: USGS NLDI contributing basin, NLCD 2021 land cover, and public facility inventories. project figure. Older bloom counts in the chapter are not the current tally; land cover and facility points do not quantify pollution loads.
  27. U.S. Fish & Wildlife Service, comments on the PAD and Scoping Document 1 and study requests, September 29, 2025, accession 20250929-5203. Bloom near the intake: pp. 2 and 14; no continuous minimum flows and the daily flow range: pp. 5 and 16; 2019 jurisdictional request: p. 1. FERC record.
  28. NYSDEC, comments on the Revised Study Plan, March 26, 2026, accession 20260326-5034 (pp. 1–2: April 15–November 15 season; monitor depths in Sturgeon Pool). FERC record.
  29. Central Hudson, Second Study Progress Report (July 1–October 1, 2026), October 1, 2026, accession 20261001-5305; status tables on PDF pages 11–13. FERC record. Applicant-reported progress, not results.
  30. NYSDEC, Sturgeon Pool: physical features and access, consulted October 9, 2026. Access descriptions do not grant a right to enter private property.
  31. Robert Howe, field photographs, 2025. Drone: MAX_1694, Sturgeon Pool shoreline, September 27 (hosted); MAX_2189 and MAX_2192, lower Sturgeon Pool, September 6 (hosted 2189, 2192); MAX_4525 and MAX_5429, upper Sturgeon Pool, September 29, the latter within about 100 m of DEC sample 1306STU0453A_C of the same day (hosted 5429). iPhone: IMG_3446, Dashville pool, August 10, 17:32 EDT, about 30 m from DEC site 13-WALK-5.0 whose confirmed sample is timed 17:33 (hosted); IMG_8818, bloom at a concrete structure, August 28, no GPS in file, location per photographer (hosted). Project media register entries SRC-0246 to SRC-0259; web copies have EXIF/GPS removed; drone clock offsets unverified. Local copies in assets/.
  32. CUNY TV, 2026 New York Emmy nominations, listing the October 10, 2026 awards date. Consulted October 9, 2026. No award outcome is reported on this page.
  33. New York State Department of Environmental Conservation, Comments, Sturgeon Pool and Dashville Hydroelectric Projects, Docket Nos. UL19-1-000 and UL19-2-000, January 4, 2021, accession 20210104-5135, responding to Central Hudson's October 29, 2020 comments; Exhibit A (1919 Conservation Commission approval, Dashville dam, United Hudson Electric Corporation), Exhibit B (July 19, 1922 approval, Sturgeon Pool dam). Open the letter (PDF); FERC record.
  34. FEMA, Flood Insurance Study 36111CV004B, Ulster County, New York, Volume 4, Wallkill River flood profiles (panels 239P–248P), effective November 18, 2016. Open the flood profiles (PDF); FEMA Map Service Center. Section spacing, the missing near-dam reach, and the 3–19 ft screening depths come from the project's provisional reading of the digital NFHL cross-sections (October 9, 2026), not from a published analysis.
  35. Central Hudson Gas & Electric, Revised Study Plan, Dashville and Sturgeon Pool Projects, March 11, 2026, accession 20260311-5037; Appendix E, Aquatic Mesohabitat Assessment Study Plan (agency request for a bathymetric survey; Central Hudson's statement that it "will provide the results of the … FEMA … Flood Insurance Study"). FERC record.
  36. Wallkill River Watershed Alliance, October 6, 2026: interactive reach-and-sector map (self-contained Leaflet page; 12 mainstem reaches in 5 sectors; 89 supplied watershed reports, 65 assigned to mainstem reaches; Esri basemaps) — open; table "HAB Report Records by Analytical Reach and Year" (NYS DEC-archived mainstem/Sturgeon Pool reports 2015–2025, n = 52, 38 unique dates) — hosted; infographic "Harmful algal blooms cluster in the Wallkill's dammed, flat-water pools" (2022 lidar river-surface profile) — hosted. The infographic's 47-of-55 count is not reproducible from the dated tally and is superseded; see the tally section on this page.
  37. Central Hudson Gas & Electric, Pre-Application Document, May 30, 2025, accession 20250530-5372, sections 4.3.2.2 and 5.3 (PDF pp. 34, 59–60): Sturgeon Pool "surface area of 251 acres and a gross storage capacity of approximately 2,894 acre-feet" at 132.5 feet, "approximate mean depth of 34 feet, a maximum depth of 93 feet"; Dashville 256 acres, 515 acre-feet at 172.5 feet, "approximate mean depth of 5.9 feet, a maximum depth of 38 feet." The Dashville pool's "approximately 10 miles" extent is cited from the same document in the tally methods. FERC record. Not copied locally (47 MB).